755 Projects + 112 Countries + 51 Years = Real Experience

Bob Morhard is available to join your project team to quickly and cost-effectively provide technical subject-matter expertise with "know-how" acquired by experience gained within 755 projects over 51 years in 112 countries supporting most of the world's largest explosive, propellant, detonator and military ordnance producers. This will enable your company to achieve the Best Demonstrated Available Technology (BDAT), equipment and procedures. The range of projects completed includes: research and development, raw materials approvals, formulation and chemistry, processing plant design and siting, regulatory approvals, UN and US DOT Hazardous Materials Certification, production processing, equipment design, procedure development, packaging design, handling, operator safety, risk-management, storage, logistics, use and application, insurance underwriting, accident investigation, life-cycle management, recycling and disposal.

  • Explosives
  • Propellants
  • Pyrotechnics
  • Military Ordnance
  • Fireworks
  • Detonators
Project Expertise
  • 89 total explosive, propellant and pyrotechnic production facilities
  • 70 emulsion explosive production facilities (est. 40+ million mT manufactured)
  • 3 RDX (1,3,5-Trinitro-1,3,5-triazinane) explosives manufacturing facilities
  • 2 TNT (Trinitrotoluene) explosives manufacturing facility
  • 3 Insensitive explosives manufacturing facilities
  • 4 TNT/PETN (Pentolite) cast explosives manufacturing facilities
  • 1 HMX/TNT (Octol) cast explosives manufacturing facility
  • 1 RDX (1,3,5-Trinitro-1,3,5-triazinane) re-crystallizer
  • 5 recycle single, double and triple base propellant recycling plants
  • 2 single, double and triple base propellant manufacturing facilities
  • 4 electronic detonator assembly lines
  • 9 electric detonator manufacturing line
  • 9 non-electric detonator assembly lines
  • 12 non-electric detonator shock tube extrusion manufacturing lines
  • 5 emulsion explosive emulsifier plants (4 PIBSA and 1 SMO)
  • 8 pyrotechnic delay element manufacturing and loading lines
  • 4 rocket motor mixing and casting lines (1.1 and 1.3 propellant)
  • 3 rocket motor demilitarization and disposal lines (1.1 propellant)
  • 2 large rocket motor (ICBM) propellant wash-out lines
  • 2 pyrotechnics manufacturing facilities
  • 2 emulsion explosive bulk truck assembly lines
  • 11 explosives ordnance demilitarization lines (350,000 mT safely processed)
  • 4 explosives ordnance wash-out, steam-out, autoclave lines
  • 1 commercial explosives waste incinerator
  • 3 automotive airbag initiator and propellant manufacturing plants
  • 2 ammonium nitrate plants
  • 3 ammonium perchlorate wash-out and re-cycling facilities
  • 4 ammonium perchlorate pond removal and remediation projects
  • 3 thermite production facilities
  • 1 shaped-charge production and filling line
  • 2 land mine removal and disposal programs
  • 40+ UN Hazards Testing for unknown explosives substances and articles
  • 100+ Hazards and Operability Studies for new and existing explosives processes
  • 50 + new explosives storage / magazine sites